logo
people are viewing this item right now
ID: 283606
/

Please note that the colors of the products displayed on your device may vary slightly from the actual product colors due to the variations in color representation on different devices and screen settings. The dimensions and proportions of product details (panels, glass) depend on the size of the product and may not match the indicated picture on the website.

Show More
  • AI preview
  • See Item Live

    See Item Live

    Find item in our showrooms

  • Order Video Call

    Order Video Call

    Get a video consultation

Specifications for Ego 5012

Type

Interior bi-fold door

Door configuration

2 folding panels

Panel style

3 Panel

Door system type

Sliding

Model

5012

Model Name

Ego 5012

Manufacturer

SARTODOORS

Material

Solid wood

Door surface finish

Veneer

Color palette

Marble Oak Veneer

Color

Brown

Glass

No Glass

Door thickness

1 9/16"

Instructions for Ego 5012

(1.00 MB)
(2.47 MB)
Cleaning & Care Instructions
To keep your door looking like new, always clean it gently and regularly:
  • Use mild detergent only
  • Wipe gently with damp cloth
  • Avoid metal scourers
  • Handle lacquered surfaces with care

Installation guide for Ego 5012

Installation Manual

Installing your Ego 5012?

Step-by-step guide to install your United Porte bi-fold door. Follow the instructions carefully for a perfect fit and long-lasting performance

View installation guide
  • Expert tips
  • Step by step installation
  • Helpful visuals

FAQ for Ego 5012

When will I receive my door?

Can I change or cancel my order after purchase?

What should I do if my order arrives damaged?

What’s included with my door?

Is this door suitable for a bathroom?

Do you offer installation or measurement services?

Can I order a custom size?

Is there a warranty?

Can I return my door if it doesn’t fit?

What if some parts are missing from my order?

Where are United Porte doors made?

How should I care for my door?

How do I choose the correct door opening direction?

Can I buy just the door slab without the frame?

Are your doors displayed in showrooms?

Can I order extra hardware or trims?

How can I track my order?

Reviews for Ego 5012

Solid wood interior bi-fold door | Ego 5012 Brown | 48 x 96 (2* 24x96) in.

Copy full details
In stock
2 YEARS WARRANTY
Price from: $1,455

During peak season, options and services that require additional work on the door add 5 business days to pick-up or delivery time.

SARTODOORS
We are the official dealer of Sarto Doors
This door with different opening type
Ego 5012 interior swing door 18x80 brown solid wood

Swing

Ego 5012 interior swing double door 36x80 (2* 18x80) brown solid wood

Double swing

Ego 5012 interior pocket door 18x80 brown solid wood

Pocket

Ego 5012 interior pocket double door 36x80 (2* 18x80) brown solid wood

Double pocket

Ego 5012 interior barn door 18x80 brown solid wood

Barn

Ego 5012 interior barn door 18x80 brown solid wood

Barn

Ego 5012 interior barn double door 36x80 (2* 18x80) brown solid wood

Double barn

Ego 5012 interior barn double door 36x80 (2* 18x80) brown solid wood

Double barn

Ego 5012 interior barn bypass door 36x80 (2* 18x80) brown solid wood

Barn bypass

Ego 5012 interior door slab 18x80 brown solid wood

Slabs

Ego 5012 interior bi-fold double door 72x80 (4* 18x80) brown solid wood

Double bifold

Ego 5012 interior closet bypass door 36x80 (2* 18x80) brown solid wood

Bypass

Door size: 48" x 96" (2* 24x96)
In stock

During peak season, options and services that require additional work on the door add 5 business days to pick-up or delivery time.

Recommended opening: 48 9/16'' x 98 7/8'' inches. Having trouble choosing the door size? Order a measurer  or  watch our video guide
Item in Stock (ships in 2-21 business days) Out of Stock Made-to-order item (ships in 15-17 weeks)

Complete the order:

During peak season, options and services that require additional work on the door add 5 business days to pick-up or delivery time.

Choose Services

During peak season, options and services that require additional work on the door add 5 business days to pick-up or delivery time.

Delivery Options

Delivery Service
See estimated delivery costs
Showroom Pick Up
View pickup locations

2 YEARS WARRANTY   against defects in workmanship and materials

We accept

Ego 5012 Marble Oak Description

An elegant collection of premium natural wood doors with a stunning veneer coating, designed to enhance modern neoclassical interiors

Premium decorative films based on polypropylene are used to create an outstanding imitation effect of a painted surface, while being free from solvents and formaldehyde, making them environmentally friendly. The high-quality material surface is easy to clean and offers excellent resistance against mechanical stress and chemicals.

Finish: Veneer coating in a natural wood tone.

Door core: Solid wood (engineered wood).

Thickness of the door: 1 9/16".

Doors do not have pre-drilled holes for hardware.

What's included:

  • 2 door slabs
  • Casings (2.95" wide)
  • Track
  • Pivot set
  • Pivot brackets
  • Converging panel aligner
  • All mounting screws

The Ego Collection introduces a new level of sophistication with its premium natural wood doors featuring a veneer coating. These doors are crafted to elevate the style of any space, combining elegance with durability for a lasting impression.

Designed to save space and provide easy access, the Ego Collection doors are a practical and stylish solution for modern interiors. Their sleek finish and top-notch craftsmanship ensure they stand the test of time, making them an excellent investment for any home or office.

As a leading door supplier in NYC, we are committed to providing high-quality products that exceed expectations. The Ego Collection's premium natural wood doors with veneer coating are a testament to our dedication to delivering excellence in design and functionality.

In summary, the Ego Collection's premium natural wood doors with veneer coating offer a blend of style, durability, and practicality, making them a perfect choice for any space. Contact us today to elevate your interiors with the timeless elegance of the Ego Collection!

$1,455
Add to cart

Schedule your appointment to visit showroom / warehouse

Please write a review

What did you think of your latest purchase? Share your experience with others!

Optional. Up to 3 photos (JPG, PNG, WEBP, GIF), max 5 MB each.

We use cookies to provide this service. Read more about how we use cookies in our policy. Please note that your location won't be shared.

We use cookies to provide this service. Read more about how we use cookies in our policy. Please note that your location won't be shared.